Skip to main content

Sustainable Future Theatre

header v3

Loading

Twin wall technology - Is this the future of fast and functional self build construction?

01 May 2023
Sustainable Future Theatre
Time Savings – No need for formwork, no waiting time for the removal of the formwork, reduced drying out time for buildings. No Limits – no limitation to structural options. Paint ready – smooth surfaces, ready for decorating and painting, no plastering needed. Low Risk – fewer personnel required on site.

  • Trending now electric vehicles